Reinstatement Contractor in Perth WA
For over 50 years, Boretech Contracting has been restoring the ground surface to its original condition once underground work is complete, across Perth metro and regional Western Australia. From a trench across a footpath to a driveway, road, or paved area opened up for trenching, drilling, or pit works, our crews put the surface back permanently and to the standard the council or road authority requires, not as a temporary patch left for someone else to finish.
We offer permanent reinstatement for concrete footpaths, concrete driveways, bitumen roadway, and brick paving. Because Boretech performs the trenching, directional drilling, cable hauling, and asbestos removal that opens the surface in the first place, the same crew that dug it puts it back, so there is no gap between the works finishing and the surface being made good.
Contact Us
What Is Reinstatement?
Reinstatement is the restoration of a surface that has been opened up for underground work, returning it to its original condition once the works below are complete.
Temporary reinstatement is a quick, safe patch to reopen access or traffic while the works continue. Permanent reinstatement is the final, engineered restoration built to last. Boretech delivers permanent reinstatement across the surface types its utility and civil work commonly disturbs, including:
- Concrete footpaths
- Concrete driveways
- Bitumen roadway
- Brick paving
- Trench and excavation backfill compacted to the required density before any surface goes back
Why Clients Choose Boretech for Reinstatement in Perth WA
Boretech treats reinstatement as part of finishing the job properly, not an afterthought. Our crews close out the surface to the same standard they apply to the works beneath it.
The Crew That Opened It Puts It Back
When the contractor doing the underground works is different to the contractor reinstating the surface, the make-good slips through the gap: the trench is left patched, the driveway stays open, and the client is left coordinating two trades to finish one job. Boretech performs the works and the reinstatement under one contract, so the surface is restored as the closing stage of the same programme.
- Single contractor across the underground works and the surface reinstatement
- No handover gap between the works finishing and the surface being made good
- Reinstatement scoped and priced into the job from the start, not bolted on later
- One point of accountability if a reinstated surface ever needs attention
Full Surface Range Reinstated In-House
Boretech reinstates every surface its utility and civil work commonly disturbs, so a single job that crosses a footpath, a driveway, and a road does not need to be split across separate finishing trades.
- Concrete footpath reinstatement
- Concrete driveway reinstatement
- Bitumen roadway reinstatement
- Brick paving reinstatement, lifted and relaid to match the existing surface
Permanent Reinstatement, Done Properly
A reinstated surface is only as good as what sits beneath it. Boretech compacts the backfill in layers to the required density and prepares the base before the wearing surface goes back, which is what stops a reinstatement from sinking or cracking months later. The visible finish is matched to the surrounding surface so the repair is not an eyesore.
- Trench backfill compacted in layers to the specified density
- Subbase and base prepared before the surface is reinstated
- Wearing surface matched to the surrounding finish
- Built to last as the permanent restoration, not a temporary patch
Company-Owned Plant and Support Fleet
Boretech operates over 200 items of plant from its Balcatta and Kalgoorlie bases, including the compaction, concreting, and transport plant reinstatement requires, maintained in-house and mobilised on our schedule rather than a hire company’s availability.
- Compaction plant sized for trench, footpath, driveway, and road reinstatement
- Concreting and surfacing plant for footpaths, driveways, and pavements
- Supporting transport and excavation plant maintained in-house
- Kalgoorlie regional base for faster mobilisation into Goldfields and Mid West work
Council and Road Authority Reinstatement Standards
Reinstatement in a road reserve has to meet the standard set by the authority that owns it, whether that is Main Roads WA for state roads or a local government’s restoration requirements for council assets. Boretech reinstates to those standards and provides the compaction and quality records where required.
- Reinstatement to Main Roads WA specifications for state road reserves
- Local government restoration delivered to WALGA reinstatement guidelines and council requirements
- Compaction and quality records provided where the authority requires them
- Work delivered under the Work Health and Safety Act 2020 (WA)
How Boretech Manages Reinstatement
Boretech applies the same controlled process to every reinstatement, whether the scope is a single footpath crossing or road reserve reinstatement across a long civil alignment.
Reinstatement Scope and Surface Match Assessment
Before reinstatement begins, the team confirms what surface is being restored and to what standard. The existing surface type, the authority that owns it, and the applicable reinstatement specification are established, along with whether the finish needs to match adjacent concrete, asphalt, or paving. This sets the materials, layer thicknesses, and finish required so the reinstatement is built once and built correctly.
Backfill and Compaction to Density
The trench or excavation is backfilled in controlled layers and each layer is compacted to the required density. This is the stage that determines whether the surface above holds or fails, so it is done to specification rather than rushed. Where the authority requires it, compaction testing is carried out and the results recorded.
Subbase and Base Preparation
With the backfill compacted, the subbase and base layers are prepared and trimmed to the correct levels and thicknesses for the surface going back on top. The base is matched to the wearing surface, whether that is a concrete footpath, a driveway, a bitumen road, or a paved area, so the finished surface sits flush with the surrounding ground.
Surface Reinstatement
The wearing surface is reinstated to match what was there before. Concrete footpaths and driveways are formed, poured, and finished to the surrounding profile. Bitumen roadway is reinstated to the road authority’s surfacing specification. Brick paving is relaid, matching the existing pattern and levels and reusing the original pavers where they are sound. Each surface type is reinstated to its own method rather than a single generic patch.
Finishing, Curing, and Quality Check
The reinstated surface is finished, edged, and left to cure where concrete or bitumen is involved, with the area protected until it is ready for use. The finished surface is checked against the surrounding levels and the applicable standard so there is no trip hazard, ponding point, or sunken patch left behind.
Site Clean and Sign-Off
Once the surface is reinstated and cured, the site is cleaned of spoil, offcuts, and materials, and any compaction or quality records are provided to the client or authority. The reinstatement is signed off against the scope before Boretech demobilises, so the area is handed back finished.
Supporting Network, Civil and Infrastructure Delivery Across WA
Our reinstatement services are typically delivered as the final stage of a broader project, helping clients return sites to specification, satisfy asset owners, and complete works without bringing in additional contractors.
Network Owners and Utility Providers
For telecommunications and utility operators, reinstatement is the final step that turns completed underground works into a fully restored site. After pit installations, cable upgrades, service connections, or network expansions, Boretech reinstates affected footpaths, verges, roads, and driveways so assets can be handed back in a condition that meets stakeholder and community expectations.
Principal Contractors
Reinstatement often becomes a critical close-out activity on civil infrastructure projects. Boretech supports principal contractors by delivering reinstatement as a self-performed scope, reducing subcontractor coordination and helping projects move efficiently from construction through to completion.
Road Authorities
Public infrastructure works demand reinstatement that aligns with authority standards and permit conditions. Boretech restores surfaces within road reserves, council-controlled land, and transport corridors while meeting specification requirements, documentation obligations, and traffic management protocols where required.
Developers, Builders and Commercial Project Teams
Service installation and civil construction frequently leave external surfaces requiring repair before a project can be considered complete. Boretech reinstates driveways, pathways, hardstand areas, and paved surfaces to integrate with the finished development, allowing sites to be handed over ready for occupation and use.
Licences, Accreditations and Safety
Licences and Registrations
- EC Licence: 14748
- WorkSafe Restricted Asbestos Removal Licence: WR2407
- ABN: 68 623 214 497
- ACN: 623 214 497
- Compliant with the Work Health and Safety Act 2020 (WA)
Safety and Compliance
- All field personnel trained in SWMS compliance and service strike prevention
- DBYD referral and on-site utility locating completed before mobilisation on every project
- NDD used to positively expose services before any mechanical works commence
- Experienced under live traffic management plans, road reserve permits, and environmental management plans
- WorkSafe Restricted Asbestos Removal Licence WR2407 held for ACM encountered during excavation
Recent Reinstatement Projects
Hamilton Hill Gas Main Upgrade, Perth WA
We delivered the installation of 1.2 kilometres of 160mm gas main in Hamilton Hill as part of a major network upgrade project, working through challenging limestone ground conditions while maintaining productivity across a busy urban corridor. To minimise traffic management requirements and reduce disruption, we carefully planned the drilling sequence and operated two drill rigs to maximise production, while coordinating pipe stringing, welding locations, and material movements to keep the project progressing efficiently.
Kathleen Valley Lithium Project, Goldfields WA
We delivered a HDD package at Liontown Resources’ Kathleen Valley Lithium Project, installing two 560mm sleeves beneath the Goldfields Highway to accommodate critical power and water infrastructure. Working in challenging gabbro rock conditions and environmentally sensitive areas, we carefully managed the drilling works to minimise ground disturbance while maintaining programme requirements.
Mt Whaleback Mine, Pilbara WA
We completed 220 metres of 160mm power conduit installation beneath two haul roads at BHP’s Mt Whaleback Mine, the world’s largest open-pit iron ore mine. Working in extremely hard rock conditions, our team successfully steered a single drill shot through challenging ground using a Vermeer D40x55DR HDD rig. The project marked the longest drill shot completed by Boretech at the time and was delivered safely, efficiently, and to the client’s satisfaction.
Locations We Serve Across WA and Australia
Boretech operates from our Balcatta workshop and Perth office, with a regional base in Kalgoorlie supporting faster mobilisation into the Goldfields and regional WA.
Perth Metropolitan Areas
- Balcatta
- Joondalup
- Osborne Park
- Morley
- Ellenbrook
- Midland
- Malaga
- Cannington
- Rockingham
- Armadale
- Fremantle
- Canning Vale
- Cockburn
- Mandurah
- Stirling
- Wanneroo
- Bassendean
- Bayswater
- Belmont
- Victoria Park
- Subiaco
- Nedlands
- Claremont
- Cottesloe
- Karrinyup
- Scarborough
- Inglewood
- Mount Lawley
- Mirrabooka
- Nollamara
- Bentley
- Thornlie
- Gosnells
- Maddington
- Kenwick
- Wangara
- Landsdale
- Dianella
- Yokine
- Innaloo
Regional and Goldfields WA
- Kalgoorlie
- Geraldton
- Esperance
- Albany
- Karratha
- Port Hedland
- Dampier
- Newman
- Broome
- Tom Price
- Carnarvon
- Exmouth
- Merredin
- Narrogin
- Northam
- York
South West WA
- Bunbury
- Busselton
- Margaret River
- Collie
- Harvey
- Capel
- Dunsborough
- Manjimup
- Bridgetown
Interstate
- Adelaide SA
- Sydney NSW
Frequently Asked Questions About Reinstatement in Perth WA
A reinstatement contractor restores surfaces affected by construction, utility, and civil infrastructure works. Boretech performs reinstatement works across roads, footpaths, driveways, commercial properties, and warehouses, helping clients return a property to its original condition following excavation or installation activities. As a specialist company with extensive experience, we provide reinstatement services that simplify project delivery and reduce the need for multiple contractors.
The restoration process begins with an assessment of the site to determine the nature, scope, and access requirements of the works. We then prepare the area, complete any required repair works, and restore the surface so it can be reinstated to its original state wherever possible. Depending on the project, the process may involve modifications to paving, walls, ceiling finishes, tiles, fixtures, or surrounding infrastructure.
In most instances, yes. Our goal is to restore affected surfaces to their former position, original condition, or original state following utility, plumbing, or civil construction works. Every property is assessed individually to determine the most appropriate restoration approach and ensure the finished surface blends with the surrounding area.
The cost of reinstatement depends on several factors, including site access, surface type, project complexity, required modifications, and the overall range of services needed. Following an assessment, we provide affordable pricing and clear payment information so clients understand what they will pay before works commence. Each factor is carefully considered to ensure accurate quoting.
Yes. We regularly perform reinstatement works on commercial properties, warehouses, industrial facilities, utility corridors, and development sites. Our expertise and ability to manage complex projects ensure every property is prepared for safe use and final handover once works are completed.
We determine the required scope through a detailed assessment of the site, existing conditions, project requirements, and relevant authority standards. Our knowledge, skills, and extensive experience allow us to identify the most appropriate repair and restoration solution while ensuring all required works are prepared and completed efficiently.
Where required, Boretech can provide evidence of completed works, compaction testing, quality records, and project documentation. These records support the handover process and provide clients with confirmation that reinstatement has been completed to specification. In some cases, this evidence may assist with future project reviews or compliance requirements.
Yes. We work closely with contractors, clients, landlords, tenant representatives, management groups, utility providers, and other parties involved in a project. Our workers understand their duties and work collaboratively to ensure the project continues to progress efficiently from commencement through to completion.
Reinstatement works must comply with relevant legislation, authority directions, project requirements, and construction standards. Failure to apply the correct standards can result in disputes, delays, fines, or other compliance issues. Boretech follows all relevant requirements to ensure works are completed correctly and accepted by the asset owner.
Boretech combines expertise, knowledge, and proven ability across a wide range of reinstatement and restoration projects. Whether we are called in to perform works from the outset or because another contractor was unable to complete the job, we have the resources and experience required to restore affected areas safely and professionally. Every decision is based on site conditions, project requirements, and long-term performance outcomes.
Yes. For example, where access is restricted, multiple parties are involved, or specialised construction methods are required, we can develop a tailored solution. In every case, we assess the situation, determine the most suitable approach, and apply our expertise to deliver the required outcome. If a matter has been decided by a client, authority, or other member of the project team, we can work within those requirements to carry out reinstatement works efficiently.
Changes can occur throughout the life of a project. If additional works are required, access conditions change, or unforeseen circumstances arise, we review the situation and update the scope accordingly. This process helps ensure the future progress of the project is not affected. While terms such as employee, dismissed, dismissal, court, appeal, act, case, instance, or decision are more commonly associated with legal proceedings than reinstatement, maintaining accurate records and payment documentation helps protect all parties and provides clarity should any disputes arise.
Partner With a Reinstatement Team Backed by 50+ Years of Experience
With more than 50 years of combined civil and utility infrastructure experience, Boretech delivers compliant, permanent reinstatement across concrete, asphalt, paving, and road reserve surfaces throughout WA, SA, and NSW.
Contact us today to discuss your project scope and receive a no-obligation quote.
For project and job enquiries: estimating@boretechcontracting.com.au (08) 6377 7682
Vac truck hire enquiries: vactruck@boretechcontracting.com.au
Workshop and office: 5 Kenhelm St, Balcatta WA 6021
Regional office: 96 Egan St, Kalgoorlie WA 6430
Licences: EC 14748 | WorkSafe Asbestos WR2407 | ABN 68 623 214 497
