INTRODUCTION

Karara Mine Site, Western Australia alongside Way Electrical 

SCOPE

Boretech were moved to site in a very short timeframe to complete 4x160pe Power Conduits underneath a live conveyor belt supplying HV power supply to the new refinery that’s currently under construction.

EQUIPMENT

Vermeer 40x55DR Series 3

GROUND CONDITIONS

Clay & Rock

CHALLENGES

• Mobilising to site on minimal notice

• Change of scope as deep HV Power eliminated the original plan to install 1 x 310mm Steel Sleeve. A Risk Assessment was conducted and a plan made to use HDPE conduit allowing flex to drill beneath HV with safe clearances.

TEAM SUCCESS

Exceptional teamwork shown working alongside the Way Electrical team.

DURATION

7 days 

DATE COMPLETED

March, 2023