• Mobilising to site on minimal notice
• Change of scope as deep HV Power eliminated the original plan to install 1 x 310mm Steel Sleeve. A Risk Assessment was conducted and a plan made to use HDPE conduit allowing flex to drill beneath HV with safe clearances.