INTRODUCTION
Karara Mine Site, Western Australia alongside Way Electrical
SCOPE
Boretech were moved to site in a very short timeframe to complete 4x160pe Power Conduits underneath a live conveyor belt supplying HV power supply to the new refinery that’s currently under construction.
EQUIPMENT
Vermeer 40x55DR Series 3
GROUND CONDITIONS
Clay & Rock
CHALLENGES
• Mobilising to site on minimal notice
• Change of scope as deep HV Power eliminated the original plan to install 1 x 310mm Steel Sleeve. A Risk Assessment was conducted and a plan made to use HDPE conduit allowing flex to drill beneath HV with safe clearances.
TEAM SUCCESS
Exceptional teamwork shown working alongside the Way Electrical team.
DURATION
7 days
DATE COMPLETED
March, 2023