Project: Bullsbrook


INTRODUCTION

Boretech were contracted to work alongside Valmec Australia in Bullsbrook, WA. 

SCOPE

Installation of 1km of DN355 PE PN25

EQUIPMENT

40×55 DR Drill

Vermeer 6,000L Unit Mine Spec

GROUND CONDITIONS

Sand

CHALLENGES

Within the area there was a lot of groundwater and extensive dewatering was required. 2x mud mixing systems were used throughout the job to pump continuous mud. This involved Boretech running 2×6,000L Vac Trucks back to back. These ground conditions required specialised tooling and correct mud selection. 

TEAM SUCCESS

Boretech’s team demonstrated exceptional team-work and communication, in particular with the way we handled mud-mixing & mud disposal. 

DURATION

3 weeks

DATE COMPLETED

August, 2022