INTRODUCTION
Boretech were contracted to work alongside Valmec Australia in Bullsbrook, WA.
SCOPE
Installation of 1km of DN355 PE PN25
EQUIPMENT
40×55 DR Drill
Vermeer 6,000L Unit Mine Spec
GROUND CONDITIONS
Sand
CHALLENGES
Within the area there was a lot of groundwater and extensive dewatering was required. 2x mud mixing systems were used throughout the job to pump continuous mud. This involved Boretech running 2×6,000L Vac Trucks back to back. These ground conditions required specialised tooling and correct mud selection.
TEAM SUCCESS
Boretech’s team demonstrated exceptional team-work and communication, in particular with the way we handled mud-mixing & mud disposal.
DURATION
3 weeks
DATE COMPLETED
August, 2022