• Mobilisation & Demobilisation to site with 2 x Large Drill Rigs.
• Supply of all Material for HDD.
• Project Management of SOW.
• Welding and testing of all Conduit.
• HDD of 2 x 560mm Sleeves underneath the Goldfields Highway.
• Sleeve 1 – 7 x power conduits
• Sleeve 2 – 315pe water pipe