Project: Mitchell Freeway Extensions


INTRODUCTION

Boretech were engaged by a new Client to provide a large package of works to service the Mitchell Freeway Extension.

SCOPE

65 Drill Shots all being different configurations.

EQUIPMENT

• D24x40 

• D40x55DR

GROUND CONDITIONS

Limestone/Caprock/Sand

CHALLENGES

Drilling up multiple embankments in Rock was challenging but executed perfectly.

TEAM SUCCESS

We were incredibly impressed with the crew’s ability to plan and execute the bore through difficult terrain and pitches.

DURATION

Ongoing

DATE COMPLETED

Ongoing