Project: Mitchell Freeway Extensions INTRODUCTION Boretech were engaged by a new Client to provide a large package of works to service the Mitchell Freeway Extension. SCOPE 65 Drill Shots all being different configurations. EQUIPMENT • D24x40 • D40x55DR GROUND CONDITIONS Limestone/Caprock/Sand CHALLENGES Drilling up multiple embankments in Rock was challenging but executed perfectly. TEAM SUCCESS We were incredibly impressed with the crew’s ability to plan and execute the bore through difficult terrain and pitches. DURATION Ongoing DATE COMPLETED Ongoing VIEW ALL PROJECTS