Boretech where awarded a package of work for a valued client upgrading BHPs Sewage System at the Welshpool Training Centre.
SCOPE
• Service Locating the proposed route inside boundary.
• Installation of 980m of 11 x 63mm PE.
EQUIPMENT
D40x55DR
GROUND CONDITIONS
Sand
CHALLENGES
Additional time was required to further investigate the site and its underground services. There was a lot of unknown assets and limited information on existing services.
TEAM SUCCESS
Planning shots to minimise welding & wasted conduit.